AP MW - SAFAI KARMACHARIS

AP CPI (VDA) Points (917+58= 975) raised 58 points w.e.f 01-04-2013.


AP CPI (VDA) Points (847+37= 884) raised 37 points w.e.f 01-04-2012 to 30-09-2012



SAFAI KARMACHARIS
Notification issued vide G.O.Ms.No.108, LET&F (Lab.II) Dept., dt:08-12-2009
Published in Gazette No. 67 , dated 09-02-2010 
Wages Linked at 590 CPI points
CPI points notified as on 01-04-2012 = 884 points
VDA to be paid from 01-04-2012 to 30-09-2012 = 884 - 590 =  294 Points
Per point rate of VDA notified in the notification = Rs.8.45
Minimum Wages and VDA payable from 01-04-2012 to 30-09-2012
Sl.No. Name of the Category Duration of working hours per day  Basic VDA for 210 points Total Wage
1 2 3 4 5 6
Zone-I Zone-II Zone-III Zone-I Zone-II Zone-III Zone-I Zone-II Zone-III
1 Safai Karamcharis Sewerage, Soil, Bath Room and Latrines and other similar type of work is working as Labourers  8 hours 5460.00 5200.00 5000.00 2484.30 2484.30  2484.30  Col 4+ Col 5 Col 4+ Col 5 Col 4+ Col 5



Twitter Delicious Facebook Digg Stumbleupon Favorites linkedin More