Area-wise Minimum Rates of Wages for the Scheduled Employments in the Central Sphere
w.e.f April 1, 2012 to September 30, 2012
Sr. No.
|
Name of Scheduled Employment
|
Category of
Workers |
Rate of wages
including VDA per day (in Rs.) | ||||
Area A
|
Area B
|
Area C
| |||||
1
|
Agriculture
|
Unskilled
|
181
|
164
|
162
| ||
Semi skilled/ Unskilled Supervisor
|
198
|
183
|
167
| ||||
Skilled/ Clerical
|
215
|
198
|
182
| ||||
Highly Skilled
|
240
|
220
|
198
| ||||
2
|
Workers engaged in
Stone Mines for Stone Breaking and Stone Crushing |
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
| |||||
(a) Soft Soil
|
180.06
| ||||||
(b) Soft Soil with Rock
|
272.55
| ||||||
(c ) Rock
|
361.15
| ||||||
2. Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift
|
143.66
| ||||||
Stone Breaking or Stone Crushing for the stone size
| |||||||
(a) 1.0 inch to 1.5 inches
|
1120.93
| ||||||
(b) Above 1.5 inches to 3.0 inches
|
957.71
| ||||||
(c ) Above 3.0 inches to 5.0 inches
|
559.92
| ||||||
(d) Above 5.0 inches
|
459.62
| ||||||
3
|
Sweeping and
Cleaning |
Unskilled
|
270
|
223
|
180
| ||
4
|
Watch and Ward
|
Without Arms
|
270
|
223
|
180
| ||
With Arms
|
298
|
253
|
210
| ||||
5
|
Loading and Unloading
|
Unskilled
|
270
|
223
|
180
| ||
6
|
Construction
|
Unskilled
|
270
|
223
|
180
| ||
Semi skilled/ Unskilled Supervisor
|
298
|
253
|
210
| ||||
Skilled/ Clerical
|
328
|
298
|
253
| ||||
Highly Skilled
|
357
|
328
|
298
| ||||
7
|
Non-Coal Mines
|
Above Ground
|
Below Ground
| ||||
Unskilled
|
180
|
223
| |||||
Semi skilled/ Unskilled Supervisor
|
223
|
270
| |||||
Skilled/ Clerical
|
270
|
313
| |||||
Highly Skilled
|
313
|
357
| |||||
Sr. No.
|
Name of Scheduled employment
|
Nomenclature
|
1
|
Agriculture (1)
|
Agriculture
|
2
|
Workers engaged in Stone Mines for Stone Breaking and Stone Crushing (1)
|
Workers engaged in Stone Mines for Stone Breaking and Stone Crushing
|
3
|
Sweeping and Cleaning (1)
|
Employment of Sweeping and Cleaning excluding Activities prohibited under the Employment of Manual Scavengers and Construction of Dry Latrines (Prohibition) Act, 1993
|
4
|
Watch and Ward (1)
|
Employment of Watch and Ward
|
5
|
Loading and Unloading (1)
|
Employment of Loading and Unloading in (i) Goods Shed, Parcel Officers of Railways; (ii) Other Goods sheds, Godowns, Warehouses, etc. and; (iii) Docks and Ports
|
6
|
Construction (4)
|
Construction or maintenance of Roads and Runways or in Building Operations including laying down Underground Electric, Wireless, Radio, Television, Telephone, Telegraph and Overseas Communication Cables and similar other Underground Cabling Work, Electric
|
7
|
Non-Coal Mines (36)
|
Employees engaged in the employment of Gypsum Mines, Barytes Mines, Bauxite Mines, Manganese Mines, China Clay Mines, Kynite Mines, Copper Mines, Magnesite Mines, White Clay Mines, Stone Mines, Stone Mine, Statite Mines (including mines producing Soap
|
Area "A"
| ||
Ahmedabad (UA)
|
Delhi (UA)
|
Kanpur (UA)
|
Bengaluru (UA)
|
Greater Mumbai (UA)
|
Lucknow (UA)
|
Kolkata (UA)
|
Hyderabad (UA)
|
Chennai (UA)
|
Nagpur (UA)
| ||
Area "B"
| ||
Agra (UA)
|
Gorakhpur
|
Mysore (UA)
|
Ajmer
|
Guwahati City
|
Nasik (UA)
|
Aligarh
|
Guntur
|
Pune (UA)
|
Allahabad (UA)
|
Gwalior (UA)
|
Patna (UA)
|
Amravati
|
Indore (UA)
|
Raipur (UA)
|
Aurangabad (UA)
|
Hubli- Dharwad
|
Rajkot
|
Bareilly (UA)
|
Jabalpur (UA)
|
Ranchi (UA)
|
Bhavnagar
|
Jaipur (UA)
|
Sholapur (UA)
|
Bikaner
|
Jamshedpur (UA)
|
Srinagar (UA)
|
Bhopal
|
Jodhpur
|
Surat (UA)
|
Bhubaneshwar
|
Kochi (UA)
|
Tiruvanantapuram (UA)
|
Amritsar
|
Kolhapur (UA)
|
Vadodara (UA)
|
Chandigarh (UA)
|
Kozhikode (UA)
|
Varanasi (UA)
|
Coimbatore (UA)
|
Kota
|
Vijaywada (UA)
|
Cuttack (UA)
|
Ludhiana
|
Vishakhapatnam (UA)
|
Durgapur
|
Madurai (UA)
|
Warangal
|
Faridabad Complex
|
Meerat (UA)
| |
Ghaziabad (UA)
|
Moradabad (UA)
| |
Area "C" will comprise of all areas not mentioned in this list
| ||
NB: U.A stands for Urban Agglomeration
|
Disclaimer : All efforts have been made to update the minimum wage data on a regular basis.However, there might be unforeseen errors.
|